[1]
Umarov, K. and Tursinalieva, Y. 2024. Evaluation of the Projected Railway and the Adopted Project Solutions. Journal of Transport. 1, 2 (Jun. 2024), 140-143. DOI:https://doi.org/10.56143/2181-2438-2024-2-140-143.